This project will see over 3,000 piles driven to sustain the new bridge foundation. Currently 1,200 have been driven by many different pieces of equipment.
Pile drivers/extractors were also used to drive the steel piles that ranged from 60 to 220 ft in length. The Tier Four 580T Power Units were employed as environmental concerns played a huge role on this job site.